Injection molding ยท Quality
Scrap-Adjusted Output Calculator
Convert gross molded output and scrap rate into expected good output. Use this as a documented planning estimate, then validate it against the actual machine, mold, resin, and process.
Formula and method
Good output = gross output x (1 - scrap rate).
Use gross and scrap values measured over the same production population.
Inputs and units
Use controlled records, CAD, measured production data, the exact resin data sheet, or machine-maker specifications. Keep the material and time basis with the result.
Worked example
10,000 gross parts at 3% scrap = 9,700 good parts.
What the result supports
This result is a first-pass screen for quality planning. Use it to identify the next record or engineering check, not as a release decision.
Sanity check
Check the unit basis and whether all quantities describe the same cavity, shot, machine, or production window before comparing values.
Important limitation
This does not diagnose a defect mechanism or account for rework policy.
Reference: ARBURG: cycle-time optimisation.
Next calculation
FAQ
What must be checked after using scrap-adjusted output calculator?
Retain the input source and compare this estimate with the applicable machine, mold, supplier, or production record before relying on it.